Construction sites are fascinating. 

I noticed about a month ago that I was lacking in the exercise department. The shut down had shut me down physically and I was starting to really feel (and see) it.

That's when I decided that I would start walking every day. I take a break from work at 11 and head downtown to do about a 45-minute loop. My route varies but I always cross the river on the Jefferson St. bridge which gives you a great vantage point of the library's construction.

I decided to take a picture every day from the same vantage point to see the progress. The following pictures are from about a month of progress.

I'm not stopping anytime soon, so I'll have another batch next month.

Rockford Library Progress

 

More From Rockford's New Country Q98.5